Third Lutheran Church

27. d’abril 2014

Third Lutheran Church
2011
Louisville, Kentucky

Client
Third Lutheran Church
 
Architect
Architectural Artisans
Louisville, KY

Structural Engineer
Steve Leonard Engineering

Contractor
T.C. Peters Construction Company

Site Area
0.56 acres

Building Area
196-sf addition; 15,000-sf existing church

Photographs
Josh Meredith

Drawings
Architectural Artisans

View of front church facade showing general character of the architecture and large number of steps to the main entry.

What were the circumstances of receiving the commission for this project?

Architectural Artisans was approached with the project based upon the previous work in the community and a reputation for thoughtful, contextual design that reimagines conventional boundaries. Through the 21 years of the firm’s practice, the vast majority of the projects can be mapped within a three mile radius of the office.

View of existing rear classroom and fellowship hall addition with failing stairwell.

Please provide an overview of the project.

This project for the Third Lutheran Church in Louisville is an ADA lift addition to a 1930’s gothic revival church in the Clifton landmarks district. As you can see in the initial photo the main floor is well above grade. As with many churches the members start their service with a social cup of coffee. This, along with the fact that commuters enter from a rear parking area guided the decision to place the ADA access towards the rear of the building at the end of the classroom corridor where it would not only link to the sanctuary, but to the classrooms and basement fellowship hall used for community functions. Fortunately, the church owns the house/parsonage next door providing room in the rear yard to place the addition and develop the landscape to enhance the arrival sequence.

The two main goals were to respectfully relate the new addition to the existing church and for the new addition to function as the primary entrance from a rear parking area.

View of new addition from street as the proposed secondary entrance.

What are the main ideas and inspirations influencing the design of the building?

The programmatic functions drove the design form. The goal was to maintain a clean, modern addition juxtaposed against the more ornate design of the church but also be respectful of the overall context, scale and material choices. The limestone cladding became a natural choice that relates to the foundation of the church while also having a more playful contemporary aesthetic.

View of the addition as you approach.

How does the building relate to contemporary architectural trends, be it sustainability, technology, etc.?

The elevator addition is an example of the most basic ideologies of sustainability and adaptive reuse – rather than causing irreparable damage the existing historic structure by inserting an elevator within the existing footprint, the addition uses otherwise unused courtyard space to accentuate the church, courtyard and entry sequence from the parking area. Complimenting the siting and design approach are the locally sourced material selections, which at their root are sustainable in nature. The concrete stairs and limestone cladding will outlast the vast majority of the structures adjacent to the church and aim to create a sense of permanence within the design.

View of north elevation showing steps that lead up to main floor. It’s interesting to note that the center handrail was not required but provided as a way to comfort and guide users safely from the lift to the main door.

How would you describe the architecture of Kentucky and how does the building relate to it?

The architecture of Kentucky, as with most eastern states, evolved from the work of skilled craftsmen and not that of professionally trained “architects.” As such, a great number of the significant structures in Kentucky are designed with this detail and craftsmanship forming a secondary layer and interpretation to the larger form and aesthetic goals. Third Lutheran Church, originally constructed in 1931, is no exception.

View of new lift and stair addition in context with the original church.

The elevator addition was designed and constructed to celebrate the craftsmanship and the masonry detailing that is ever present in the larger context of the church, though this detailing was reinterpreted in a more contemporary, yet timeless style. The form itself speaks to its own iconic nature but remains subdued and humble. As one approaches the addition, the texture and pattern of the limestone creates an extremely tactile and pedestrian oriented experience. Also worth noting is that the limestone cladding was quarried from Indiana about 50 miles from the site.

Email interview conducted by John Hill.

View showing lift door which travels up to main level or down to basement level.
View of south elevation which serves as the primary entrance from rear ADA parking area for the sanctuary above and fellowship hall below.
Site plan
Floor plan
Elevations
Section

Third Lutheran Church
2011
Louisville, Kentucky

Client
Third Lutheran Church
 
Architect
Architectural Artisans
Louisville, KY

Structural Engineer
Steve Leonard Engineering

Contractor
T.C. Peters Construction Company

Site Area
0.56 acres

Building Area
196-sf addition; 15,000-sf existing church

Photographs
Josh Meredith

Drawings
Architectural Artisans

Articles relacionats

Projecte destacat

Nattler Architekten

Vaillant Betriebsrestaurant in Remscheid

Altres articles d'aquesta categoria