Cable Stayed Bridge Aggerbogen, Lohmar DE

Lohmar, Germany
Photo © IB-Miebach
Photo © IB-Miebach
Photo © IB-Miebach
Engineers
Ingenieurbüro Miebach
Location
Hammerwerk, 53797 Lohmar, Germany
Year
2013
Client
Stadt Lohmar
Execution planning, Project management and Execution
Schaffitzel Holzindustrie GmbH

Dimensions:
Length: 62,32 m
Width: 2,00 m

Structure:
Blocklaminated glulam main beams made of spruce, top side covered with natural stone slabs, lateral cladding made of larch, steel railing with Accoya handrail

Object planning:
Leistungsphasen 1-9

Structure planning:
Leistungsphasen 1-6
(according to german HOAI)

The pylon bridge "Aggerbogen" in Lohmar Wahlscheid is a bridge that blends harmoniously into the natural environment and cycling area. A key design of the bridge is the curved S-shaped arrangement of the main beams - in allusion to the river Agger. This has the advantage that crossing the bridge between the parallel streets accommodates the natural handling of cyclists. Another advantage during floods is the approximately parallel arrangement of the ramps.

The deck of the bridge is braced by two pylons, which require only two foundations. Despite the complex geometry of the bridge, most of it could be prefabricated in larger pieces and installed within a few days. A decking with granite slabs gives this bridge a special value and longer durability.

Related Projects

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressive cleanroom expansion
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

Other Projects by Ingenieurbüro Miebach

timber roof structure Assen Station
Assen, Netherlands
Wide Span Girder Bridge, Neckartenzlingen DE
Neckartenzlingen, Germany
Timber-Concrete Composite Bridge, Lohmar DE
Lohmar, Germany
Timber-Granite Hybrid Bridge, Schwäbisch Gmünd DE
Schwäbisch Gmünd, Germany
Rheinsteg in Rheinfelden DE CH, Suspension Bridge with Timber Structure
Rheinfelden, Switzerland