Erweiterung Rosensteinschule

Stuttgart, Germany
Photo © Zooey Braun
Photo © Zooey Braun
Photo © Zooey Braun
Photo © Zooey Braun
Photo © Zooey Braun
Photo © Zooey Braun
Architects
Drei Architekten
Location
Nordbahnhofstraße 120, 70191 Stuttgart, Germany
Year
2013
Client
Landeshauptstadt Stuttgart, Hochbauamt

A school from the 50's with a three-storey main building and single-storey pavilions had to be extend by a cafeteria, student lounges and classrooms for biology and physics. The new building connects directly to the angular main building with a new entrance, a staircase, an elevator and toilet facilities. The south-oriented hallway of the old building is diverted to the north side of the new building, so that all newly created spaces will benefit from the southern sun and the view to the green school grounds. The cafeteria with 96 seats and the kitchen are located on the bottom floor, the student lounges on the middle floor, and the two special classrooms and a preparation room upstairs. The facade of glass and fiber cement panels is structured horizontally by plastered stripes in front of the concrete slabs.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by Drei Architekten

High School
Weil am Rhein, Germany
Rück- und Neuaufbau Gerhard-Schanz-Sportzentrum
Althengstett, Germany
City Hall Neu-Anspach
Neu-Anspach, Germany
Stadt- und Kongresshalle Vallendar
Vallendar, Germany
Generalsanierung Goethe-Gymnasium Ludwigsburg
Ludwigsburg, Germany