Lausward power station

Düsseldorf, Germany
Photo © Jens Kirchner
Photo © Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
© Jens Kirchner
Architects
kadawittfeldarchitektur
Location
Düsseldorf, Germany
Year
2015

BRIEF: Design of the power-station façade and construction of a new visitor platform as a viewing platform on the Rheinbogen (curve of the river Rhine) in Düsseldorf, in close proximity to the harbour and city centre .

ADDED VALUE: The façade combines a viewing platform and components of a power station to form a complex that acts as a built logo for the municipal power supplier through the interaction of a closed framework and joints that are illuminated at night.

Kraftwerk Lausward, a power station for producing heat and electricity on the Rheinbogen, is visible from afar, an optically dominant feature that marks the southwestern boundary of the city. The existing complex is now being extended through a new, highly efficient, low-emission natural-gas power station. A façade of steel frames will give the diverse parts of the new building a common appearance. The individual modules can react to all demands placed on them by the interior. At the same time the large total volume gains an acceptable structure through the rhythm that is given to the façade. The concluding and the largest element of the framework in the northeast of the complex is the so-called ‘window on the city’, which envelops the existing power-station chimney, the highest point of the building complex. A lift ascends to a viewing platform at a height of approx. 45 m, from where guided groups of visitors can look through a glass façade south across the plant and north towards the city centre of Düsseldorf.

Typology
ower-station façade, window on the city with visitor platform

Construction volume
Window on the city with visitor platform
gross floor area (GFA) 1620 m², gross volume(GV) 33,500 m3, façade area total approx. 24,000 m², of which approx. 2700 m² is glass façade

Client
Stadtwerke Düsseldorf

Architect
kadawittfeldarchitektur

Plant engineering
SIEMENS AG

Construction
Sept. 2012 – Oct. 2015

Competition
1st prize 2012

Project management
Burkhard Floors

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by kadawittfeldarchitektur

Pandion The Shelf
Berlin, Germany
Grünenthal – new office building No. 411
Aachen, Germany
Neue Direktion
Köln, Germany
Archeologogical Pavilion Elisengarten
Aachen, Germany
Erweiterung Dressurstadion
Aachen, Germany