Mango Processing Unit

Ratnagiri, India

Adaptive use of a self-supporting proprietary roof system eliminates the need for high maintenance structural trusses in the process hall interior.

A passive ventilation system incorporates low 'horizontal' window strips for air intake with helical metal air extractors on the roof driven by natural drafts. This arrangement, along with the shade provided by standing metal roof seams, permits a comfortable work space even during the hot humid summer season.

Separation of 'skin' and 'structure' not only facilitates ventilation of this seemingly windowless building, but also provides a sheltered corridor for running services piping that can be accessed easily even during heavy monsoon rains.

Architects
Flying Elephant Studio
Location
Mirjole Industrial Estate MIDC, Kolhapur Road, 415639 Ratnagiri, India
Year
2004
Client
Exotic Fruits Ltd.
Architects
Kiran Chandra, Ceejo Cyriac, Rajesh Renganathan
Structure
Manjunath & Co
MEP
NV Rao, MD Deshmukh
Contractors
Anand Patil

Related Projects 

  • Five Camphor Courtyard
    Parallect Design
  • Kindergarten Müllerwis
    Walo Bertschinger AG | Bodenbeläge
  • Lanserhof Sylt
    TROPP LIGHTING DESIGN
  • Fire Station Zeven
    abj Architekt:innen GmbH
  • Umbau / Sanierung Wohnhäuser in Emmenbrücke
    GKS Architekten AG

Magazine 

Other Projects by Flying Elephant Studio 

GMR - Schulich School of Business
Hyderabad, India
APF School and District Institute
Yadgir, India
Divya Shanthi Campus
Bangalore, India
IIIT-B Student Centre
Bangalore, India
Dr. APJ Kalam Science City
Patna, India