Palatine Passive

17. octubre 2016

Palatine Passive

2015
Greenwood, Seattle, Washington

Client
DL Bowie

Architect
Malboeuf Bowie Architecture
Seattle, WA

Design Principal
Tiffany Bowie

Project Team
Tiffany Bowie & Joe Malboeuf of Malboeuf Bowie Architecture

Structural Engineer
Carissa Farkas Structural Engineering

Landscape Architect
Blue & Yellow Builders LLC

Inteiror & Lighting Design
Malboeuf Bowie Architecture

Contractor
Blue & Yellow Builders LLC

Construction Manager
Tiffany Bowie of Blue & Yellow Builders LLC

Passive House Consultant
Dan Whitmore of Hammer and Hand

Triple-pane Windows
Klearwall

Heat Recovery Ventilator
Zhender

Heat Pump
Mitsubishi

Energy Monitoring System
Kirio

Site Area
6,000 sf

Building Area
2,700 sf

Photography
Shea Pollard Photography

Drawings
Malboeuf Bowie Architecture

What were the circumstances of receiving the commission for this project?
The house was commissioned by a family member looking to build a passive home within a set budget.

Please provide an overview of the project.
Palatine Passive is an energy-efficient-driven project for a homeowner who is a retired energy consultant. The two level structure includes 3 bedrooms, 2.5 bathrooms as well as a loft. The open two-car carport doubles as a shelter for outdoor gatherings. The home was designed to meet Passive House Certification and was officially certified as a Passive House by PHIUS (Passive House Institute US) in April 2016.

What are the main ideas and inspirations influencing the design of the building?
We were inspired by the simplicity of Scandinavian design and architecture. The interiors were driven by an open plan concept and a 'lightness' in the materials selection. We liked the idea of expressing a very simple form for the structure, while adding specific details and textures to the exterior form and window trim. Additionally, the method Japanese shou sugi ban was of great interest interest to us for aesthetic and durability reasons. We decided to treat the cedar on the east facade with shou sugi ban to provide a lasting treatment to the siding. The rest of the structure was clad with a factory finished fiber cement panel that will not require paint for 15 or more years.

How does the design respond to the unique qualities of the site?
The site is an urban infill lot in an up an coming neighborhood in Greenwood. The design challenge was to provide adequate lighting, natural light and within the parameters of PHIUS while maintaining privacy. The east facade facing a busy street allows ample light into the interiors from designing a jog in the structure. Large floor to ceiling windows are placed strategically to allow a light filled space that is private from the street.

How did the project change between the initial design stage and the completion of the building?
Originally the project was designed as a three-story residence. Due poor soils on the site, the excavation was limited to 30”. Due to zoning height restrictions, we changed the design to two floors with a loft.

Was the project influenced by any trends in energy-conservation, construction, or design?
Passive House influenced much of the overall form and window placement. The volume was designed to provide optimal efficiency without compromising important design features such as high ceilings and ample light. The floor plan remained as open as possible to allow light from various locations to penetrate the spaces.

What products or materials have contributed to the success of the completed building?
Passive House is a fully integrated process where each material and system contributes to the success of the entire project. This includes cladding, insulation, wall assemblies, roofing assemblies, and the HVAC systems, as well as the the floor plan layout.

Email interview conducted by John Hill.

Palatine Passive

2015
Greenwood, Seattle, Washington

Client
DL Bowie

Architect
Malboeuf Bowie Architecture
Seattle, WA

Design Principal
Tiffany Bowie

Project Team
Tiffany Bowie & Joe Malboeuf of Malboeuf Bowie Architecture

Structural Engineer
Carissa Farkas Structural Engineering

Landscape Architect
Blue & Yellow Builders LLC

Inteiror & Lighting Design
Malboeuf Bowie Architecture

Contractor
Blue & Yellow Builders LLC

Construction Manager
Tiffany Bowie of Blue & Yellow Builders LLC

Passive House Consultant
Dan Whitmore of Hammer and Hand

Triple-pane Windows
Klearwall

Heat Recovery Ventilator
Zhender

Heat Pump
Mitsubishi

Energy Monitoring System
Kirio

Site Area
6,000 sf

Building Area
2,700 sf

Photography
Shea Pollard Photography

Drawings
Malboeuf Bowie Architecture

Artículos relacionados

Proyecto destacado

Nattler Architekten

Vaillant Betriebsrestaurant in Remscheid

Otros artículos de esta categoría