Modular prefabricated house S+V
- arkkitehdit
- Sadar+Vuga
- Year
- 2015
Type
modular prefabricated house
Source
project commission
Client
Marles d.o.o.
Total floor area
178 m2
Storeys
ground floor
Program
one family house with covered parking and outdoor area
Structure
wooden frame + panels
Cladding
wooden colored wall, opaque glass, mesh blinds, glass sliding walls
The Modular prefabricated house S+V is a free-standing, ground floor, residential structure, which combines modern building technologies of prefabricated wooden structures with an eco-friendly design, providing maximum comfort all year round.
The house is based on a 4.4m x 4.4m x 2.5m wooden construction grid providing the future client with different layout possibilities in accord to their needs and desires. The grid is filled with various panels: wooden partition wall panels, coloured wooden facade panels and glass sliding panels. Through the catalogue selection of the appropriate wall and facade panels, as well as through the close collaboration with the architects, the future Modular house S+V dweller can develop the design most suitable to his lifestyle. The construction grid is placed on top of the concrete base slab, which expands beyond the house’s outline. Here the outer living areas appear covered by three stripes of a wavy roof with laminated wooden beams.
The stripes of the roof are shifted in such a way that openings are generated in between, enabling natural illumination and ventilation of the interior. The wavy roof contributes to the energy efficiency of the proposed house design.
The white wavy roof, the wooden construction and coloured facade panels result in a memorable image of a completely modular and prefabricated house S+V.
The house can be placed into different landscapes, from the Mediterranean and lowland to the hilly and alpine. Because of its flexibility, the house can be programmed either for permanent living or for a weekend home.
The construction period of the Modular prefabricated house S+V, from the foundations set up to the actual moving in, takes 5-6 months.
Related Projects
Magazine
-
Winners of the 5th Simon Architecture Prize
6 days ago
-
2024, The Year in …
1 week ago
-
Raising the (White) Bar
1 week ago
-
Architects Building Laws
1 week ago