Visualisation © Pinearq
Visualisation © Pinearq
Photo © WFB Wirtschaftsförderung Bremen GmbH

EcoMaT – Center for Ecoefficient Materials & Technologies

 Retour à la liste des projets
Lieu
Cornelius-Edzard-Straße 15, 28199 Bremen, Allemagne
Année
2019
Équipe
Alberto de Pineda, Manuel Brullet, RaÚl GarcÍa, Joachim Staudt, Alfonso de Luna, Christian Huber, Álvaro Valcarce, Marian Almansa, José-Carlos Castro Barros, Greta Dalma Medgyesi, Sohta Mori

The Center for Eco-efficient Materials and Technologies EcoMaT is located at the Airport-Stadt Bremen, an international transportation hub. The building was designed by Pinearq, Brullet de Luna and Huber Staudt Architects BDA.

The 22,779 sq. mt. of this research and development centre will be occupied by around 500 specialists in science and technology who will investigate light construction. Airbus is the main tenant of this new space with 300 employees who will focus on the future of the aviation industry.

Part of the economic policy of the region is to encourage close cooperation between different disciplines. This is why this cutting-edge nucleus was created, which has also been built with the latest technologies. The centre is strategically located on the site and is structured as an open-linear building, and then fragmented into blocks to adapt to the location’s scale.

The two first floors are designed for laboratories and the next two for offices. Two green patios allow natural air and light to enter the compact base of the labs. The main entrance is a double-height lobby that can be used as an exhibition hall; from this entry, anyone – even for neighbours and pedestrians – has clear access to the cafeteria and the auditorium.

Autres projets de PINEARQ

Extension of Bellvitge University Hospital - Phase I
L'Hospitalet de Llobregat, Espagne
Anti-Doping Laboratory in Doha
Doha, Qatar
QuirónSalud Madrid University Hospital
Pozuelo de Alarcón, Espagne
Santa Caterina Hospital in Martí i Julià Hospital Park
Salt, Espagne
Hedwigshöhe Hospital
Berlin, Allemagne