Mei architects and planners

McDonald's Pavilion

Mei architects and planners
9. 6月 2015
Photo: Ossip van Duivenbode

The former kiosk was once voted the ugliest building in Rotterdam and no longer reflected the wishes and ambitions of either McDonald’s and the city of Rotterdam. 

Photo: Jeroen Musch

Connection with the city
The new building volume has been carefully detailed and articulated by Mei to open up views of the monumental post office behind it. As a result, the pavilion has the most compact possible core, with glazed façades all around. A fully transparent lobby, with entrances on three sides, makes it seem as though the public space flows through the building.

To strengthen the connection between the pavilion and its surroundings, the outdoor terrace will feature the same furniture found in other public spaces in the city of Rotterdam.

Photo: Jeroen Musch

A shining pavilion — day and by night
Like the historical buildings in the area, the pavilion features a richly articulated façade, carried out in one single material: gold anodized aluminum. This warm and elegant-looking material is vandal-proof and enduring at the same time.

As McDonald’s is open day and night (24/7), its appearance after dark is important. By day the building is inviting to shoppers, while in the evening it glows to attract the nightlife crowd. The skin is perforated with heart-shaped openings to form a "veil" around the glazed building through which illumination shines. This skin is continued in the interior walls and ceilings. With the application of various degrees of perforation, the façade depicts a crowd of people on Coolsingel. After all, the new McDonald’s is built for the people of Rotterdam, who now have yet another reason to be proud of their city.

Photo: Jeroen Musch

Integrated power boxes
The various power boxes for utilities and traffic regulation systems, always an eyesore on the street, are integrated into the building. Moreover, the incorporation of illumination into the façade will enhance safety on the street. Technical installations are integrated within the roof, which is designed as a fifth façade.

Photo: Jeroen Musch

View on Coolsingel
Counter and kitchen are located on the ground floor. A one piece steel spiral staircase leads from the lobby to the seating area on the first floor. From here the visitors have a beautiful panorama view overlooking Coolsingel.

Photo: Jeroen Musch
Photo: Jeroen Musch

PROJECT CREDITS

Architect:
Mei architects and planners
Team Mei: Robert Winkel , Menno van der Woude , Michiel van Loon , Robert Platje , Ruben Aalbersberg
Contractor: BVR Groep
Structural engineer: Adviesbureau Roelen
MEP: Sweegers & de Bruijn
Façade: Glasimpex
Stairs: WV trappen
Fire safety: Grontmij
Interior design: NivOO3
 

Ground floor plan
First floor plan

関連した記事

このカテゴリ内の他の記事

Ephemeral Bubble
on 2024/07/18
Simone Veil Bridge
on 2024/07/17
The Vibes Co-Space
on 2024/03/06
Beijing City Library
on 2024/02/26
Metropolitan Station
on 2024/02/20