Iberia Centre for Contemporary Art

Beijing, China
建築家
Approach Architecture Studio
2008

Project description:

This project is located at 798 art district, Beijing. It is a redevelopment project converting a group of industrial buildings to an integrate art centre.

Project Name: Iberia Centre for Contemporary Art

Location: Beijing

Client: Iberia Centre for Contemporary Art

Architect: Liang Jingyu

Project Team: Peng Xiaohu, Yang Jieqing, Li HongleiZhou Yuan

Structure and Material: Steel Structure with some brick bearing structure

Building Area: 3000 sq.m.

Cost: 9 million RMB

Design Period: August 2007 to May 2008

Construction Period: September 2007 to July 2008

関連したプロジェクト

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Approach Architecture Studio によるその他のプロジェクト

Minsheng Art Museum
Shanghai, China
Hyundai Motor Studio
Beijing, China
The Exhibition Design for Shenzhen Biennale 2009
Guangdong, China
Yangmeizhuxiejie Street
Beijing, China
Dashilar Urban Revitalization
Beijing, China