Trost & Associates Architecture
Intra Lighting Headquarters
Trost & Associates Architecture
6. juni 2016
North facade
The client wished to restore an older, large industrial complex in the Primorska region in Slovenia. Most of the area is intended for storage, logistics, and potential future production.
A smaller segment of the existing prefabricated concrete building was assigned to offices and administration. The structure’s facade was peeled off, all the way to the bearing construction. New steel floors were added and a new facade was hung on the existing load bearing pillars.
The organization of space and program facilities was divided into horizontal and vertical. The main lobby volume cuts in the building through three floors in height and provides a new staircase and elevator. The lobby functions as a dividing or interconnecting component among different branches within the company, though it also serves as a connecting element for socializing of employees. The remaining two parts are divided into two primary platforms: an open floor arrangement and a more classical disposition with glass-enclosed offices.
PROJECT DETAILS - Location: Vrtojba, Slovenia - Area: 1500 m2 - Client: Intra Lighting - Architect: Trost & Associates Architecture - Team: Jan Trošt, Nejc Trošt, Peter Krapež