Photo © Roger Frei
Photo © Roger Frei
Photo © Roger Frei
Photo © Roger Frei
Photo © Roger Frei
Photo © Roger Frei
Siteplan
Ground floor
Elevation, Longitudinal section

Culture and Congress Centre

 Terug naar projectenlijst
Locatie
Seestrasse, 3602 Thun, Zwitserland
Jaar
2011
Klant
City of Thun
Type of Commission
Competition
Competition
2005, 1st prize
Planning
2005 – 2009
Start of construction
06.2009
Completion
04.2011
Space Program
Additional multi functional space
Size
Gross floor area: 6’400 m2 (new part)

Upgrading the town meeting hall in Thun into a culture and congress centre posed two major challenges. These were the restrictive general framework of the project and the question of how to deal architecturally with the existing building from the 1980s. The spatial situation at this location – a residential district with heterogeneous building typologies of varied graining interspersed with largescale public uses – is confined and the restricted financial resources additionally limited the designers’ room for manoeuvre. However the intention was that the extension should condense the complex in both spatial and programmatic terms and strengthen its public character. As the strategic use of resources was essential, we reduced the interventions in the existing fabric to a minimum, leaving the meeting hall with its fixed seating practically ‘untouched’. Alongside it a new, functionally neutral hall was placed. The new foyer and the existing one combine to form a richly modulated spatial figure. Carefully positioned openings establish a relationship between it and the heterogeneous surroundings.

Andere projecten van EM2N

Lucerne School of Art and Design
Emmenbrücke, Zwitserland
IM VIADUKT – Refurbishment Viaduct Arches
Zurich, Zwitserland
Keystone Office Building
Prague, Tsjechië
Heuried Sports Centre
Zürich, Zwitserland
Public Records Office Canton Basel-Landschaft
Liestal, Zwitserland