Hotel City Garden

 Voltar à lista de projetos
Localização
Metallstrasse 20, 6304 Zug, Suíça
Ano
2009
Cliente
MZ-Immobilien AG - Zug
Type of Commission
Study commission
Commission
2008
Planning phase
2008 – 2009
Start of construction
04.2009
Completion
12.2009
Space Program
4 star superior business hotel, 66 rooms – superior, 2 rooms – superior IV, 11 junior suites, 3 suites, lobby with bar, receptio
Net floor area
3’978 m2
Gross floor area
4’368 m2
Cubic content
15’024 m3

The Parkhotel in Zug planned to erect a temporary ancillary hotel building on a public site that in 12 to 15 years time will be used as the services area for a road building project. Despite the limited life–span this hotel was to meet the requirements of a four–star facility and to have an unmistakeable character.

We developed this project from the serial character of hotel buildings. The standard layout of bedrooms next to each other is transformed into an expressive building volume by swivelling the module. The sculptural façade corresponds with an internal corridor figure; the building is given a head and an end.

The idyllic location between the trees on the edge of the woods led to the idea of a reflective façade of polished chrome steel. The facetted building volume mirrors its natural surroundings and transforms the place into a kaleidoscope of building and nature. The short period for which the building will be used called for a time-saving construction method, which led to the use of a combined system (timber frame braced by a concrete core).

Outros projetos por EM2N

Lucerne School of Art and Design
Emmenbrücke, Suíça
IM VIADUKT – Refurbishment Viaduct Arches
Zurich, Suíça
Keystone Office Building
Prague, Czech Republic
Heuried Sports Centre
Zürich, Suíça
Public Records Office Canton Basel-Landschaft
Liestal, Suíça