Freitag Factory Maag

Zurich, 瑞士
建筑师
spillmann echsle architekten
年份
2003

The production of FREITAG bags requires a great deal of space. Approximately 2’780 square meters of floor area are needed in order to have the used truck tarps delivered, pulled apart, cut to the rough shape, washed, rolled, tailored, assorted, assembled, sewn together to bags and other items, photographed, stored, packed, stored again and, finally, shipped off. Additional space is taken up by small exhibitions, secondary rooms for the staff and, most of all, for office space.

The built-in office space is in a raised position within the wide-span production hall and offers space for forty workplaces. Out of functional reasons it leans against the old industrial façade. The workplaces for cutting and assembling the tarps are located directly under this new office space. V-shaped props carry the monolithic floor slab. In just a very short time the pre-fabricated, timber constructed walls and ceiling elements were joined together.

On the outside the boxes are clad in roofing paper, plastic cupolas cover the openings. The inside of the boxes presents itself as a warm universe made of PAVATEX.

相关项目

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

杂志

以下出品方的其他项目 spillmann echsle architekten

Maaglive
Zurich
Freitag Factory Noerd
Zurich, 瑞士
Tiefenbrunnen Vuelo
Zurich, 瑞士
Brunnenhof
Zurich
Neue Schule Zurich