Museu de la Música Barcelona

Barcelona, Spain
照片 © Beat Marugg
© Beat Marugg
© Beat Marugg
© Beat Marugg
© Beat Marugg
© Beat Marugg
建筑师
Arriola & Fiol
位置
Barcelona, Spain
年份
2007
团队
Arriola&Fiol, X.Arriola, M.Lundström

The project of the Auditori- Barcelona Musical Centre was initiated in the year 1989. The editing of the program predicted one program of musical activities that surpassed by far a simple concert hall. Thus, the new centre would house more than three halls for listening (symphonic, chamber and polyvalent), a school for higher musical studies, and a museum of music.

The present project of construction of the Music Museum will complete the assembly of the Auditori.

The project develops in the third, second stories and basement of the building. The spaces which house the program of the Museum are organized around a great patio. Main entrance to the Museum is provided from the main staircase from the Plaza de les Arts that arrives directly to the second floor. In this floor is grouped all the administration of the Museum, reception and information, services, meeting rooms, permanent exhibition and temporary exhibition. From the second floor, the interior stairs arrive to the third floor where the Library is found. The Library has an accessible collection and a room for research. Finally, in the basement are found the workshops for restoration and photography, publications archives administration and the storage.

The project of the Auditori- Barcelona Musical Centre was initiated in the year 1989. The editing of the program predicted one program of musical activities that surpassed by far a simple concert hall. Thus, the new centre would house more than three halls for listening (symphonic, chamber and polyvalent), a school for higher musical studies, and a museum of music.

The present project of construction of the Music Museum will complete the assembly of the Auditori.

The project develops in the third, second stories and basement of the building. The spaces which house the program of the Museum are organized around a great patio. Main entrance to the Museum is provided from the main staircase from the Plaza de les Arts that arrives directly to the second floor. In this floor is grouped all the administration of the Museum, reception and information, services, meeting rooms, permanent exhibition and temporary exhibition. From the second floor, the interior stairs arrive to the third floor where the Library is found. The Library has an accessible collection and a room for research. Finally, in the basement are found the workshops for restoration and photography, publications archives administration and the storage.

相关项目

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

杂志

以下出品方的其他项目 Arriola & Fiol

Casa Costa
Pujalt, Spain
Parc Central de Nou Barris
Barcelona, Spain
Galleria Comunale d'arte di Cagliari
Cagliari, 意大利
Place Sainte Anne
Rennes, 法國
Elbbrücken Hafen City
Hamburg, 德国