Depot District 3

Sissach, Switzerland
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Photo © Barbara Bühler
Engineers
ZPF Ingenieure
Location
Netzenstrasse 3, 4450 Sissach, Switzerland
Year
2019
Client
Bau- und Umweltschutzdirektion Kanton Basel-Landschaft
Architecture
ARGE VOSS Architects and Ebeling Architekten, Basel, Switzerland
General planner
Rapp Architekten AG

The road network in the canton Basel Country has a total length of 450 km and is maintained by means of the Civil Engineering Department's three road-maintenance depots. The depot for District 3 is on the edge of the industrial area in Sissach. As it is situated right by the A2 and A22 motorways, as well as the town access road, it is optimally connected to the local transport network. The new replacement building gives District 3 a modern and practical infrastructure for operation and maintenance of the cantonal roads in the east of Basel Country.

The new depot consists of an elongated structure with a gable roof projecting on all sides. Under this shared roof, the building is divided according to the three main functions that it accommodates: staff area / workshops, parking garage and external storage area. The areas for each of these uses are accessed from north and south via the roofed outdoor spaces.

The building is a wooden structure and its design is inspired by the local agricultural and commercial buildings. The material that characterises the depot's appearance is wood, which is used according to the respective utility functions. The salt silo, easily visible from afar, is based on the formal language of Basel Country's historical saltworks buildings, and provides an accentuating feature for the building volume's elongated roof and the surroundings.

The building's wooden support structure is made of spruce and laminated beech. The optimised structure consists solely of a rafter roof, longitudinal beams, rods and columns – an efficient load-bearing structure with maximum flexibility. The load of the rafter roof, which acts as a truss, is transferred via the roof surface, the longitudinal beams and the columns. Horizontal reinforcement is guaranteed by lateral bracing near the walls and over the roof surface. The rooms are made of prefabricated wall and ceiling elements, separate from the primary load-bearing structure.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by ZPF Ingenieure

VitraHaus
Weil am Rhein, Germany
Museum of Cultures
Basel, Switzerland
Neue Kuppel Basel
Basel, Switzerland
Movable House
Riehen, Switzerland
Verkehrsstützpunkt Kantonspolizei
Chur, Switzerland