Office Building Oskar

Munich, Germany
Lobby
Photo © Fantomas
Light Installation
Photo © Fantomas
Reception Desk
Photo © Fantomas
Architects
Arnold / Werner
Location
Oskar-von-Miller-Ring 20, 80333 Munich, Germany
Year
2018
Client
Hines
Team
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Related Projects

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Other Projects by Arnold / Werner

Wohnung Reitmorstraße
München, Germany
Bungalow Germering
Munich, Germany
Fantomas Design
Munich, Germany
Penthouse Maxvorstadt
Munich, Germany
Haus A/Z
Germany