Office Building Oskar
Munich, Alemania
- Arquitectos
- Arnold / Werner
- Ubicación
- Oskar-von-Miller-Ring 20, 80333 Munich, Alemania
- Año
- 2018
- Cliente
- Hines
- Equipo
- Arnold / Werner Architekten
- Signaletics and Light Installation
- Fantomas
In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.
Proyectos relacionados
Magazine
-
Other Ways of Making Books
hace 2 días
-
2024 RA Dorfman Prize to Ukraine's Livyj Bereh
hace 4 días
-
It Was Fifty Years Ago Today...
hace 5 días