Office Building Oskar
Munich, Alemanha
- Arquitectos
- Arnold / Werner
- Localização
- Oskar-von-Miller-Ring 20, 80333 Munich, Alemanha
- Ano
- 2018
- Cliente
- Hines
- Equipa
- Arnold / Werner Architekten
- Signaletics and Light Installation
- Fantomas
In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.
Projetos relacionados
Revista
-
Luxury Properties With Fire Sale Prices
1 day ago
-
Zen and the Art of Watercolors
5 days ago
-
International 2024 Piranesi Award
6 days ago
-
Sculpted by the Sun
1 week ago